Computerised Caisson Shaft Jacking

Computerised Caisson Shaft Jacking

Computerised Caisson Shaft Jacking system Preston UID (2003 – 2005) A computer-controlled jacking system was developed which delivers complete verticality control over the shaft-sinking process. Since pioneering this technique, it has been used to sink more than 100...
MultiMode™ TBM

MultiMode™ TBM

MultiMode™ TBM Heathrow Terminal 5 Tunnels (2002 – 2005) To ensure continued operation of the airport and the safety of tunnel construction as little as 4.5m below the operational airfield, the MultiMode™ Tunnel Boring Machine (TBM) was developed in collaboration with...
Grey Rock Tunnel Design Philosophy

Grey Rock Tunnel Design Philosophy

Grey Rock Tunnel Design Philosophy North Downs Tunnel Channel Tunnel Rail Link (1998 – 2002) The 3.2km North Downs tunnel required construction of the largest cross-section tunnel ever to be built in the UK at 174m2. The ‘Grey Rock’ approach considers the...
Self-Cleansing Tunnel Lining

Self-Cleansing Tunnel Lining

Self-Cleansing Tunnel Lining Hastings Bathing Water Tunnels (1997 – 2000) As part of the Hastings Bathing Waters Project designed to reduce the frequency of sewage spills to the sea; a large storage volume needed to be created to store the combined flows until they...
CombiShell™

CombiShell™

CombiShell™ Heathrow Baggage Tunnels (1994 – 1996) The first combined permanent and secondary sprayed concrete lining. The CombiShell™ tunnelling method was used to form complex underground structures required to accommodate the baggage handling equipment under...